Bridges, Structures and Pile Driving

Since its beginning in 1978 Rankin Construction has built, repaired and resurfaced dozens of bridges of every conceivable shape and size. Whether it is a major international bridge or a small ornate structure Rankin's commitment to quality ensures the safety and longevity that are essential to such projects. Our in house pile driving capabilities provide a considerable advantage for projects with less than ideal conditions where shoring or bearing piles are required. The small snapshot of our experience shown below and in the navigation panel to the right shows why Rankin is the company to call on for challenging bridge and structural projects. 

 


QL LinkQueenston Lewiston Bridge 5th Lane Project

Rankin was the general contractor of the 45 Million dollar Queenston-Lewiston Bridge rehabilitation project which was completed within 11 months of the start of construction....more

 

 


Merritt St. Bridge

The replacement of the Merritt Street Bridge for the City of St. Catharines was a test of the many skills available to Rankin Construction. This project included complete road and structure reconstruction in a very tight work area while maintaining roadway traffic....more

 


Pile Driving

An added dimension to Rankin Construction that sets it apart from the competition is the ability to do pile driving...more